cn
Three measures to improve the waterproof performance of external wall insulation materials
2021-04-08       Source:尤特森保溫材料

In recent years, with the development of national economy and construction industry, people put forward new requirements for the comfort and safety of buildings, especially external wall heat preservation materials, both heat preservation and energy saving, but also waterproof hate water.  The waterproof function of exterior wall insulation material is mainly realized through three steps.  

 建筑外墻保溫材料

Main measures to ensure the external insulation and waterproof function of external walls:  

 

First, step by step grading, releasing stress and preventing cracks is the correct technical route of external wall insulation and waterproof  

 

External thermal insulation to prevent cracks is the basis of the success of external thermal insulation waterproof technology.  The following principles should be considered to prevent cracks in the external insulation:  

 

The thermal insulation effect of external insulation meets the requirements of all structures in the same temperature environment.  Each structural layer of external thermal insulation material system should meet the unified principle of allowable deformation, induced deformation and limited deformation;  The external insulation structure should meet the flexible stress release principle, match the elastic modulus change index of each layer, and the flexible deformation of the outer layer is larger than that of the inner layer.  Uniform and dispersed soft steel bars (metal quadrilateral welding network should meet the rustproof performance, glass fiber cloth alkali strength retention rate) should meet the service life requirements.  

 

The thermal stress generated by the rapidly changing temperature difference is concentrated on the outer surface of the external insulation.  The principle of releasing temperature stress and deformation energy should be followed to solve external thermal insulation crack.  The crack prevention technology of layer by layer gradual change and flexible stress release can effectively control the surface crack of insulation layer.  The main points of structural design of layer-by-layer gradual change, flexible stress release and anti-crack technology are as follows:  

 

The performance and elastic modulus of adjacent structural layers of insulation system match and gradually change.  Anti-crack mortar should ensure certain flexibility in order to release deformation stress.  At the same time, the anti-crack protective layer adopts steel wire mesh to change the direction of stress transmission and prevent the possibility of various deformation stress concentration.  After the coating is completed, the ideal pattern should be from anti-crack mortar layer to putty layer to coating flexibility and deformation ability gradually increased;  When facing ceramic tile, should use flexible adhesive and juncture adhesive.  

 

In the application of exterior wall thermal insulation technology, adopting the principle of "release", that is, adopting flexible gradual change and releasing stress layer by layer, is the correct method to prevent exterior wall thermal insulation from cracking and ensure waterproof function.  

 外墻保溫材料

Two, solve the external wall thermal bridge problem  

Thermal bridge refers to the part of the envelope structure, including metal, reinforced concrete beams, columns, balconies, sunshades, lines, etc.  Under the action of indoor and outdoor temperature difference, heat transfer is intensive and inner surface temperature is low.  These parts form heat transfer Bridges, so they are called thermal Bridges.  These thermal Bridges are usually ignored in the absence of insulation and the temperature-induced deformation is different from that of walls with external insulation.  After a certain time of deformation and destruction, will cause these parts without thermal insulation and external thermal insulation wall junction damage cracks.  The basic way to solve the thermal bridge is to break the bridge, that is, the external insulation layer must completely cover all the external surface, so that the insulation layer is closed.  For example, parapets raised from the roof should have external insulation on the front, back and top.  

 

Three, the construction measures of the hole of the adhesive layer  

In order to prevent rain, snow and water from flowing into the insulation layer along the cavity of the bonding layer, the construction of the bonding insulation material in Chongqing must adopt the point box bonding method.  All sides of the insulation board should be coated with paste mortar, the width is not less than 5 cm, not more than 1 cm from the outside of the board, so that the paste mortar forms a closed frame, the frame should be coated with five paste mortar points.  This not only ensures the paste area, but also compacts the paste mortar to squeeze the board edge, there is no gap between adjacent boards, blocked the seepage route.  

日韩精品一区二区三区在线观看| 国产精品h片在线播放| 日本真人大尺度做爰| 亚洲精品又粗又大又爽a片| 国内精品久久久久影视老司机| 天堂网在线观看| 岳让我弄进去看a片| 精品久久香蕉国产线看观看亚洲| 国产精品黄在线观看免费软件| 亚洲永久无码7777kkk| 老熟妇色xxxx老妇多毛| 久久天天躁狠狠躁夜夜avapp| www国产成人免费观看视频| 四虎影视久久久免费| 放荡的美妇在线播放| 女厕精品合集ktv偷窥| 国产精品国产精品国产专区不卡| 婷婷综合另类小说色区| 国产精品一国产精品| 校花被老师下春药啪啪小说| 香蕉久久久久久久av网站| 国产亚洲真人做受在线观看| 国产精品ⅴ无码大片在线看| 女人被狂躁到高潮视频免费软件| 69久久夜色精品国产69| 少爷湿润粗大跪趴含bl| 啊轻点灬太粗嗯太深了用力| 欧美性色黄大片a级毛片视频| 宝宝好涨水快流出来免费视频| 极品少妇hdxx麻豆hdxx | 国产裸拍裸体视频在线观看| 亚洲av无一区二区三区久久| 狠狠色噜噜狠狠狠777米奇小说 | 亚洲A无码综合A国产AV中文| 纯肉高h啪动漫| 精品无码一区二区三区爱欲| 地铁跑酷国际服下载| 糙汉lvl奶瘾古言| 国产精品沙发午睡系列| 国产特级毛片AAAAAA高清| 无套内谢少妇毛片a片小说|